{"version":"1.2.0","chapters":[{"startTime":0,"endTime":9.363},{"startTime":9.363,"endTime":24.268,"title":"Data Centers as Strategic Energy Assets"},{"startTime":24.268,"endTime":125.528,"title":"Nico Johnson introduces the RE+ PowerUp Live session"},{"startTime":125.528,"endTime":197.848,"title":"Anne Collier sets the stage on rising energy demand"},{"startTime":197.848,"endTime":268.498,"title":"Tyler Norris on load flexibility and grid interconnection"},{"startTime":268.498,"endTime":347.738,"title":"Nelson Abramson on rethinking data center design"},{"startTime":347.738,"endTime":566.338,"title":"How much flexibility is really needed? Tyler breaks it down"},{"startTime":566.338,"endTime":711.188,"title":"Not all data centers are created equal"},{"startTime":711.188,"endTime":886.468,"title":"Crawl, walk, run: Delivering dependable flexibility"},{"startTime":886.468,"endTime":1098.899,"title":"Planning-grade flexibility vs traditional demand response"},{"startTime":1098.899,"endTime":1181.659,"title":"What’s needed from utilities, regulators, and developers"},{"startTime":1181.659,"endTime":1361.075,"title":"Planning for 30 years of unknowns"},{"startTime":1361.075,"endTime":1491.245,"title":"Bounded flexibility and real-world curtailment"},{"startTime":1491.245,"endTime":1570.495,"title":"Market signals and smarter contracts"},{"startTime":1570.495,"endTime":1618.216,"title":"Creative flexibility solutions beyond infrastructure"},{"startTime":1618.216,"endTime":1690.216,"title":"Building higher utilization and system value"},{"startTime":1690.216,"endTime":1716.516,"title":"Final thoughts from the stage"},{"startTime":1716.516,"endTime":1795.051,"title":"Nico wraps the episode with key takeaways"}]}